
201 Deansgate, Manchester
Project : Anglesey Aluminium Jetty
News : Quadriga working with Leading European Cathodic Protection Company
Project : Conway Borough County Council A55
Project : The Hollings Building, Umist, Manchester
Project : 201 Deansgate, Manchester
PROJECT: 201 Deansgate, Manchester
CLIENT: Waterman BBT
PLANNING SUPERVISOR: Stephen Southwick
CONTRACT OVERVIEW: Structural repairs to building

SCOPE OF WORKS:
Project to repair damaged brickwork.
Investigation and repair of the horizontal expansion joints on the 2nd and 4th floor of the building, as they were not functioning properly.
Loose or missing bolts fixing support bracket to edge of concrete floor slab.
Misaligned or missing serrated washers
Increased cavity widths
Weep holes in brickwork leaf above cavity tray not formed.
Cavity above cavity tray blocked with mortar debris
Reduced bearing of brickwork onto masonry support angle due to increased cavity widths
VALUE: £350k
DURATION: 8 months
Previous page: Contact Us
Reconstituted Stone | Terracotta and Faience Restoration | Timber Repair | Epoxy Resin Injection
Concrete Repair | Structural Repair | Waterproof Deck Membranes | Damp Proofing
Basement Waterproofing (Tanking Membranes) | Pest Control | Helifix | K-grip
Car Park Refurbishment



