
7 Kylemore Road, Prenton
Project : Leam Lane Housing Estate
Project : St. Sophias Church, Galston
Project : 7 Kylemore Road, Prenton
Project : St. Annes Church, Hindford
Project : Houghton-Wood Cottage
PROJECT: 7 Kylemore Road, Prenton, Birkenhead
CLIENT: Royal Sun Aliance
CONTRACT OVERVIEW: Helifix installallation
SCOPE OF WORKS:
Externally – remove and replace render to match existing.
Gain access to areas of work internally.
Relevant COSHH assessments to be consulted before any repair products are used.
Remove existing wallpaper to identified repair areas.
Repair cracks, apply a plaster skim then re-paper where necessary.
Grind out or drill slots where necessary and as appropriate to accommodate Helifix reinforcements.
Vacuum out drill holes to remove any dust traces.
Grout in reinforcement leaving neat joint.
Install 6mm Helibars to cracking of internal walls (as identified).
Repair plasterwork as required.
Previous page: Contact Us
Reconstituted Stone | Terracotta and Faience Restoration | Timber Repair | Epoxy Resin Injection
Concrete Repair | Structural Repair | Waterproof Deck Membranes | Damp Proofing
Basement Waterproofing (Tanking Membranes) | Pest Control | Helifix | K-grip
Car Park Refurbishment



