Print this page

Broomcroft Hall

Project : Broomcroft Hall
Project : Waterloo Pavilions, Blackburn
Project : Newcastle Crown Court
Project : The Swallow Hotel, Gateshead

Client : University of Manchester

Design Group Services Contract : Internal Refurbishment and External Render Repairs to this Grade II listed manor house for the new president of Manchester University

Scope of Works:


•    Replacement and overhaul of sliding sash windows and decoration of same

•    Complete rewire

•    Replumbing to form ensuites, bathrooms, utility rooms and the catering kitchen

•    Slate tiling to entrance hall and mosaic borders

•    Redecoration of all woodwork including dado, skirting and architrave

•    New hand woven carpets (Wilton)

•    Wall papering to ceilings and walls

•    Replastering to walls

•    Construction of bespoke wardrobes and kitchen

•    Replacement of curtains

•    Installation of Porcelanosa bathroom

•    Tiling to floors and walls in bathrooms and kitchen

•    Installation of suspended ceiling

Status : Principal Contractor
Value : £300K
Duration : 12 weeks

This was a single tender action negotiated contract between ourselves and the university


Previous page: Contact Us




Masonry Repair   |   Brickwork Repair   |   Stone Restoration   |   Marble and Terrazzo Restoration
Reconstituted Stone   |   Terracotta and Faience Restoration   |   Timber Repair   |   Epoxy Resin Injection
Concrete Repair   |   Structural Repair   |   Waterproof Deck Membranes   |   Damp Proofing
Basement Waterproofing (Tanking Membranes)   |   Pest Control   |   Helifix   |   K-grip
Car Park Refurbishment