Bird deterrent and pest control

Case study 1 Case study 2 Case study 3 Case study 4 Case study 5
PROJECT: Barclays Bank building, South Shields

CLIENT: Barclays Property Holdings

DESIGNER: Quadriga

CONTRACT OVERVIEW: Cleaning off bird fouling from window ledges and cornicing. Introduction of bird deterrent system x 3 elevations.

SCOPE OF WORKS:

  • Provision of fully boarded scaffold.
  • Chemically clean stone facade.
  • Disinfect roost ledges.
  • Install 28mm gauge netting system to 3No elevations to prevent starlings roosting.
  • Install sprung wire system to cornice and balustrading at roof level to stop seagulls perching.

STATUS: Principal Contractor
VALUE: £6k
DURATION: 2 weeks

Home   ::   Services   ::   CPD Seminars   ::   Customer Support   ::   Links   ::   Contact Us

Services include:

Masonry Repair
Brickwork Repair
Stone Restoration
Marble and Terrazzo Restoration
Reconstituted Stone
Terracotta and Faience Restoration
Timber Repair
Epoxy Resin Injection
Concrete Repair
Structural Repair
Waterproof Deck Membranes
Damp Proofing
Basement Waterproofing (Tanking Membranes)
Pest Control
Helifix
K-grip
Car Park Refurbishment

 

© Quadriga Limited. All rights reserved. Freephone for info: 0808 100 3777