| PROJECT: Barclays Bank building, South Shields
CLIENT: Barclays Property Holdings
DESIGNER: Quadriga
CONTRACT OVERVIEW: Cleaning off bird fouling from window ledges and cornicing. Introduction of bird deterrent system x 3 elevations.
SCOPE OF WORKS:
- Provision of fully boarded scaffold.
- Chemically clean stone facade.
- Disinfect roost ledges.
- Install 28mm gauge netting system to 3No elevations to prevent starlings roosting.
- Install sprung wire system to cornice and balustrading at roof level to stop seagulls perching.
STATUS: Principal Contractor
VALUE: £6k
DURATION: 2 weeks
|