Car park refurbishment


Case study 1 Case study 2 Case study 3 Case study 4 Case study 5
PROJECT: Newbridge Street NCP, Newcastle

CLIENT: NCP Ltd

PLANNING SUPERVISOR: Hill Cannon

CONTRACT OVERVIEW: Total car park refurbishment

SCOPE OF WORKS:

  • Installation of structural steelwork of soffit of car park
  • Access was gained by mobile access platforms
  • Cheaper plates at basement level were removed
  • Various concrete repairs to decks were carried out
  • Also beams over entrance and exist ramps were repaired
  • All soffits were scarped down
  • New fairing coat anti-carbonation coating applied to front façade

STATUS: Principal contractor
VALUE: £64k
DURATION: 8 weeks

Home   ::   Services   ::   CPD Seminars   ::   Customer Support   ::   Links   ::   Contact Us

Services include:

Masonry Repair
Brickwork Repair
Stone Restoration
Marble and Terrazzo Restoration
Reconstituted Stone
Terracotta and Faience Restoration
Timber Repair
Epoxy Resin Injection
Concrete Repair
Structural Repair
Waterproof Deck Membranes
Damp Proofing
Basement Waterproofing (Tanking Membranes)
Pest Control
Helifix
K-grip
Car Park Refurbishment

 

© Quadriga Limited. All rights reserved. Freephone for info: 0808 100 3777