General Refurbishment

Case study 1 Case study 2 Case study 3 Case study 4 Case study 5
PROJECT: Moot Hall law courts, Newcastle-Upon-Tyne

CLIENT: The Court Service

PLANNING SUPERVISOR: DTZ Debenham Tie Leung

CONTRACT OVERVIEW: General refurbishment and CTMP installation

SCOPE OF WORKS:

  • All mechanical and electrical works carried out within the courts.
  • Removed sections of the suspended ceilings, creating holes in brickwork and floors (carpets, tiles and wooden flooring) to allow access for mechanical and electrical services to be installed.
  • Reinststed all boxing, ductwork, fire stopping and floorboards.
  • Supplied and fitted new carpeting to specified areas.
  • Full cleaning of existing walls and ceilings to the entrance hall with sugar soap, removing all dirt and grime. Repair and prepare the existing cracks as necessary to receive three coats of emulsion paint.
  • Existing woodwork in reception area to be rubbed down, cleaned, prepared, undercoated and reapplied graining to match existing colours.

STATUS: Principal contractor
VALUE: £31.7k
DURATION: 8 weeks

Home   ::   Services   ::   CPD Seminars   ::   Customer Support   ::   Links   ::   Contact Us

Services include:

Masonry Repair
Brickwork Repair
Stone Restoration
Marble and Terrazzo Restoration
Reconstituted Stone
Terracotta and Faience Restoration
Timber Repair
Epoxy Resin Injection
Concrete Repair
Structural Repair
Waterproof Deck Membranes
Damp Proofing
Basement Waterproofing (Tanking Membranes)
Pest Control
Helifix
K-grip
Car Park Refurbishment

 

© Quadriga Limited. All rights reserved. Freephone for info: 0808 100 3777