PROJECT: Newcastle Crown Court

CLIENT: Rotary Yorkshire Ltd

PLANNING SUPERVISOR: Mr. Martin Bailey

CONTRACT OVERVIEW: Upgrading of the electrical infrastructure and installation of data cabling networks to allow The Court Service to install IT equipment to facilitate the implementation of the Courts and Tribunals Modernisation Programme.

SCOPE OF WORKS:

  • Removal of redundant electrical installation.
  • Removal of redundant data network.
  • Supply, install, test and commission new small power circuits.
  • Supply, install, test and commission new Cat 5e data cabling and associated patching frames and patching panels.
  • Modify the existing fire alarm systems.
  • Modift the existing alarm systems and an ancillary services.
  • Supply, install, balance, test and commission the building services installations.
  • All necessary repairs to court rooms.

STATUS: Complete
VALUE: £400k
DURATION: 30 weeks

Home   ::   Services   ::   CPD Seminars   ::   Customer Support   ::   Links   ::   Contact Us

Services include:

Masonry Repair
Brickwork Repair
Stone Restoration
Marble and Terrazzo Restoration
Reconstituted Stone
Terracotta and Faience Restoration
Timber Repair
Epoxy Resin Injection
Concrete Repair
Structural Repair
Waterproof Deck Membranes
Damp Proofing
Basement Waterproofing (Tanking Membranes)
Pest Control
Helifix
K-grip
Car Park Refurbishment

 

© Quadriga Limited. All rights reserved. Freephone for info: 0808 100 3777