| PROJECT: Leam Lane Housing Estate, Gateshead
CLIENT: Gateshead Metropolital Borough Council
PLANNING SUPERVISOR: John Davies Gateshead Council
CONTRACT OVERVIEW: Stabilisation work, Helifix works
SCOPE OF WORKS:
- Carried out stabilisation work on 243 houses.
- Repaired cracking masonry on the two-storied terraced and semi detached properties. This was due to lintel failure and differential movement within the building structures.
- Existing lintels were repaired and the masonry strengthened and secured.
- Helibeam system of structural reinforcement was installed to reinstate the failed lintels and stitch the cracked masonry.
STATUS: Principal contractor
VALUE: £286k
DURATION: 16 weeks
|