| PROJECT: St. Sophia's Church, Galston
CLIENT: Balvac Whitley Moran Ltd
CONTRACT OVERVIEW: Concrete repairs to brick arches and installation of ties into concrete vaults Helifix installation.
SCOPE OF WORKS:
- The arches inside the building needed repairing so slots were chased into the brickwork using angle grinders.
- These slots were then vacuumed out and Helifix reinforcement bars grouted into the slots to reinforce the arches.
- Repair work to secure the coping stones on the external parts of the church was carried out.
- The loose coping stones were secured into the brickwork using long dowels which were fixed in place with epoxy resin.
- The stabilisation of the front elevation using Helifix Cemties was carried out.
STATUS: Sub-contractor to Balvac Whitley Moran
VALUE: £100k
DURATION: 12 weeks
|