| PROJECT: 7 Kylemore Road, Prenton, Birkenhead
CLIENT: Royal Sun Aliance
CONTRACT OVERVIEW: Helifix installallation
SCOPE OF WORKS:
- Externally remove and replace render to match existing.
- Gain access to areas of work internally.
- Relevant COSHH assessments to be consulted before any repair products are used.
- Remove existing wallpaper to identified repair areas.
- Repair cracks, apply a plaster skim then re-paper where necessary.
- Grind out or drill slots where necessary and as appropriate to accommodate Helifix reinforcements.
- Vacuum out drill holes to remove any dust traces.
- Grout in reinforcement leaving neat joint.
- Install 6mm Helibars to cracking of internal walls (as identified).
- Repair plasterwork as required.
VALUE: £2.7k
DURATION: 1 week
|