| PROJECT: Lancaster City Museum
CLIENT: Lancaster City Council
CONTRACT OVERVIEW: K-Grip application
SCOPE OF WORKS:
- Ensured all surface substrate was free of dust, grease and surface dirt.
- Applied K-Tape to form straight curved channels.
- Applied K-Grip via skeleton gun in 2No 15mm strips along tread area of step nosings.
- Smoothed off excess material with appropriate scraper.
- Heated the material with hot air to accelerate curing where appropriate.
- All materials were applied in strict accordance with manufacturer’s instructions.
STATUS: Main Contractor
VALUE: £1.7k
DURATION: 1 week
|