| PROJECT: Kendals Store, Phase 2
CLIENT: Havelock Europa plc
CONTRACT OVERVIEW: Masonry repair, structural repair and coatings
SCOPE OF WORKS:
- Cut out electrical chase.
- Replace two Crittal windows.
- Cut out slots through brickwork for steel to pass throughs
- Cut opening through hoist wall to allow access for the hoists
- Re build brickwork to south gate elevation and to air intake ductss
- Break out twelve concrete pockets at 600 x 450
- Infill voids within 1st floor slab with hollow rib decking
- Breakout 20 steel frames and lids dispose and skip
- Break out masonry wall between phase 2A hoist and shoe studio
STATUS: Principal contractor
VALUE: £44k
|