| PROJECT: ARC Timber Jetty, Colwyn Bay, North Wales
CLIENT: ARC Aggregates
DESIGNER: Quadriga
CONTRACT OVERVIEW: Replacement of cross bracing to jetty piles in greenheart timber
SCOPE OF WORKS:
- Provision of bird cage scaffold hung from jetty platform.
- Delivery and floatation of 6m long x 300mm x 200mm greenheart timber members.
- Erection of lifting equipment in order to position the members between jetty piles.
- Drilling by hand auger and bolting of end fixings.
STATUS: Principal contractor
VALUE: £45k
DURATION: 3 summers (working within a 12 week tide window each year)
|