| PROJECT: Brancepeth Castle Golf Club, Co. Durham
CLIENT: Brancepeth Castle Gold Club
DESIGNER: Quadriga
CONTRACT OVERVIEW: Repair / restoration of timber foorbridge 130Lm long across a ravine between 9th and 10th holes of the golf course
SCOPE OF WORKS:
- Provision of access via 4 wheel drive vehicle.
- Temporary support work to main pile legs in order to cut away decayed feet.
- Introduce stainless steel reinforcement and reforming of pile feet using epoxy resin mortar.
- Removal of deck boarding and replacement with keruing boards.
- Removal / replacement of handrail and posts with Iroko posts and handrails.
- Application of Methyl Methacrylate non slip deck coating to keruing.
- Application of sikken stain and preservation to decking and handrailing.
STATUS: Principal contractor
VALUE: £25k
DURATION: 4 weeks
|