| PROJECT: Perth Avenue Underpass, South Shields
CLIENT: South Tyneside Metropolitan Borough Council
CONTRACT OVERVIEW: Refurbishment and waterproofing of pedestrian underpass to main dual carriageway
SCOPE OF WORKS:
- Installation od public safety/access barriers.
- Removal of existing defective coatings to tunnel linings by wet abrasive blasting.
- Removal of defective joint fill material.
- Replacement with Sika 4A and Sikatop 122.
- Cutting of concrete segments for new light apertures and fitting of new.
- Application of Sika 1 tanking to tunnel lining.
- Injection of polyurethane resin around new light fittings.
- Casting of new arris to rainwater channel.
- Supply and installation of new steel services casing.
- Scabbing of floor and application of an anti-slip epoxy coating.
STATUS: Principal contractor
VALUE: £45k
DURATION: 12 weeks
|