| PROJECT: 522, King's Road Project, Chelsea
CLIENT: Bouygues UK Ltd
CONTRACT OVERVIEW: Waterproof tanking to basement
SCOPE OF WORKS:
- Mechanical preparation of basement walls via bush-hammering.
- DPC fluid injected along tops of all external walls & into wall corners to protect timber wall plates.
- Installation of brick ties to stabilise brickwork.
- Installation of Sikadur Combiflex strip at wall/floor junctions to protect against cracking of render induced by differential thermal movement.
- Application of Sika 1 pre-batched tanking system to full height on walls.
- Application of Sika waterproof screed to basement floor.
- All timber window frames and service pipe details sealed with Sika Pro 2HP waterproof mastic.
STATUS: Sub-Contractor to Bouygues UK Ltd
VALUE: £76k
DURATION: 8 weeks
|