
Discovery Museum, Newcastle

Project : St. Nicholas Centre, Sutton
Project : Discovery Museum, Newcastle
Project : Erskin Bridge, Scotland
Project : CAA House, London WC1
Project : Barclays Bank building, South Shields
PROJECT: Discovery Museum, Newcastle
CLIENT: Newcastle City Council
CONTRACT OVERVIEW: Installation of bird spikes
SCOPE OF WORKS:
Installed a mobile cherry picker at the front entrance of the museum
Cleaned the surface of the cills and pipework to remove surface guano and contaminants by wire brushing.
Applied 10mm beads of waterproof silicone adhesive onto the surfaces and firmly pressed the needle strips into the adhesive ensuring full contact is achieved.
Installed bird spikes to rain water goods.
Using Neokleen Hot Box High Pressure Water Cleaning system, cleaned the external fabric to remove surface laitance/dirt deposits.
Removed all debris to appropriately marked location ensuring compliance with ‘Duty of Care’ regulations.
STATUS: Primary contractor
Previous page: Contact Us
Reconstituted Stone | Terracotta and Faience Restoration | Timber Repair | Epoxy Resin Injection
Concrete Repair | Structural Repair | Waterproof Deck Membranes | Damp Proofing
Basement Waterproofing (Tanking Membranes) | Pest Control | Helifix | K-grip
Car Park Refurbishment




