Print this page

Esholt Hall, Leeds

Click the links to see some of our work:

Project : The Roundhouse, Derby
Project : Bridge Street, Chester
Project : Ackhurst Lodge, Astley Park
Project : Esholt Hall, Leeds

CLIENT: Yorkshire Water Authority

ARCHITECT: Peters Associates Leeds

CONTRACT: Refurbishment of roof timbers and ceiling plaster, repair and preservation of floor timbers and staircases to grade II listed property.

 

SCOPE OF WORKS:

• Clean out roof void floor voids and defrass timbers.

• Carry out extensive epoxy repairs to defective beam ends.
• Splice in new purlin and rafter sections.
• Resin Injection to shakes in trusses and purlins.
• Replacement of defective wall plate.
• Re-bond ceiling plaster by application of hessian bandage and plaster of paris from above.

• Application of spray preservation treatment to all exposed timber within the roof void and floor spaces.


STATUS: Sub-contractor

VALUE: £100K

DURATION: 20 Weeks


Previous page: Contact Us




Masonry Repair   |   Brickwork Repair   |   Stone Restoration   |   Marble and Terrazzo Restoration
Reconstituted Stone   |   Terracotta and Faience Restoration   |   Timber Repair   |   Epoxy Resin Injection
Concrete Repair   |   Structural Repair   |   Waterproof Deck Membranes   |   Damp Proofing
Basement Waterproofing (Tanking Membranes)   |   Pest Control   |   Helifix   |   K-grip
Car Park Refurbishment