
Esholt Hall, Leeds
Click the links to see some of our work:
Project : The Roundhouse, Derby
Project : Bridge Street, Chester
Project : Ackhurst Lodge, Astley Park
Project : Esholt Hall, Leeds
CLIENT: Yorkshire Water Authority
ARCHITECT: Peters Associates Leeds
CONTRACT: Refurbishment of roof timbers and ceiling plaster, repair and preservation of floor timbers and staircases to grade II listed property.

SCOPE OF WORKS:
• Clean out roof void floor voids and defrass timbers.
• Carry out extensive epoxy repairs to defective beam ends.
• Splice in new purlin and rafter sections.
• Resin Injection to shakes in trusses and purlins.
• Replacement of defective wall plate.
• Re-bond ceiling plaster by application of hessian bandage and plaster of paris from above.
• Application of spray preservation treatment to all exposed timber within the roof void and floor spaces.
STATUS: Sub-contractor
VALUE: £100K
DURATION: 20 Weeks
Previous page: Contact Us
Reconstituted Stone | Terracotta and Faience Restoration | Timber Repair | Epoxy Resin Injection
Concrete Repair | Structural Repair | Waterproof Deck Membranes | Damp Proofing
Basement Waterproofing (Tanking Membranes) | Pest Control | Helifix | K-grip
Car Park Refurbishment




