Market Gate MSCP
Project : Market Gate Car Park
Project : Bengal Street Car Park, Leigh
Project : Harbour City Car Park, Salford Keys
Project : NCP Bank Street, Sheffield
Project : Arundel Gate, Sheffield Car Park
Project : NCP The Square, Sale
Client: Kirkless Borough Council
Contract: Installation of ramp to reconfigure traffic flow to facilitate new Pay on Foot system.
Scope of Works
• Block out two split levels of decks and carry out new concrete repair.
• Install new supporting steel work.
• Installation of pre-cast concrete beams.
• Installation of cast insitu re-informed concrete topping.
• Installation of new soft expansion joints.
• Installation of waterproofing, decorative non-slip membrane.
• Installation vehicle impact barriers.
Status: Main Contractors
Value: £60,000
Duration: 4 Weeks
Previous page: Contact Us
Reconstituted Stone | Terracotta and Faience Restoration | Timber Repair | Epoxy Resin Injection
Concrete Repair | Structural Repair | Waterproof Deck Membranes | Damp Proofing
Basement Waterproofing (Tanking Membranes) | Pest Control | Helifix | K-grip
Car Park Refurbishment