Market Gate MSCP

Project : Market Gate Car Park
Project : Bengal Street Car Park, Leigh
Project : Harbour City Car Park, Salford Keys
Project : NCP Bank Street, Sheffield
Project : Arundel Gate, Sheffield Car Park
Project : NCP The Square, Sale

Client: Kirkless Borough Council

Contract: Installation of ramp to reconfigure traffic flow to facilitate new Pay on Foot system.

 

 Scope of Works

• Block out two split levels of decks and carry out new concrete repair.
• Install new supporting steel work.
• Installation of pre-cast concrete beams.
• Installation of cast insitu re-informed concrete topping.
• Installation of new soft expansion joints.
• Installation of waterproofing, decorative non-slip membrane.
• Installation vehicle impact barriers.


Status: Main Contractors

Value: £60,000

Duration: 4 Weeks


Previous page: Contact Us




Masonry Repair   |   Brickwork Repair   |   Stone Restoration   |   Marble and Terrazzo Restoration
Reconstituted Stone   |   Terracotta and Faience Restoration   |   Timber Repair   |   Epoxy Resin Injection
Concrete Repair   |   Structural Repair   |   Waterproof Deck Membranes   |   Damp Proofing
Basement Waterproofing (Tanking Membranes)   |   Pest Control   |   Helifix   |   K-grip
Car Park Refurbishment