Print this page

Natwest Bank

Project : ARC Timber Jetty
Project : Brancepeth Castle Golf Club
Project : Natwest Bank, Ruthin, Wales
Project : Hexham Abbey
Project : Norton Manor Farm


PROJECT: Natwest Bank, Ruthin, Wales

CLIENT: Davies & Son Ltd

CONTRACT OVERVIEW: Timber repair and consolidation



SCOPE OF WORKS:

South Gable Elevation of the above establishment

Drill 8mm diameter holes at 100-120mm centres along the grain.

For timbers wider than 100mm across the accessible face, additional holes will be drilled at 50mm from the centre row, at staggered 120mm centres.

Inject Boron Ultra 78 Paste in pre-drilled holes.

For timbers prone to re-wetting or in continuous damp, Boron Ultra Rods will be inserted in each hole to provide a long term reservoir.

Remove all debris into appropriately marked locations ensuring compliance with ‘Duty of Care' regulations.

STATUS: Principal contractor

CONTACT US : info@quadrigaltd.com 0808 100 37777 or 01606 330888




Previous page: Contact Us




Masonry Repair   |   Brickwork Repair   |   Stone Restoration   |   Marble and Terrazzo Restoration
Reconstituted Stone   |   Terracotta and Faience Restoration   |   Timber Repair   |   Epoxy Resin Injection
Concrete Repair   |   Structural Repair   |   Waterproof Deck Membranes   |   Damp Proofing
Basement Waterproofing (Tanking Membranes)   |   Pest Control   |   Helifix   |   K-grip
Car Park Refurbishment