PROJECT: Perth Avenue Underpass, South Shields
CLIENT: South Tyneside Metropolitan Borough Council
CONTRACT OVERVIEW: Refurbishment and waterproofing of pedestrian underpass to main dual carriageway
SCOPE OF WORKS:
Installation od public safety/access barriers.
Removal of existing defective coatings to tunnel linings by wet abrasive blasting.
Removal of defective joint fill material.
Replacement with Sika 4A and Sikatop 122.
Cutting of concrete segments for new light apertures and fitting of new.
Application of Sika 1 tanking to tunnel lining.
Injection of polyurethane resin around new light fittings.
Casting of new arris to rainwater channel.
Supply and installation of new steel services casing.
Scabbing of floor and application of an anti-slip epoxy coating.
STATUS: Principal contractor
VALUE: £45k
DURATION: 12 weeks
Previous page: Contact Us
Reconstituted Stone | Terracotta and Faience Restoration | Timber Repair | Epoxy Resin Injection
Concrete Repair | Structural Repair | Waterproof Deck Membranes | Damp Proofing
Basement Waterproofing (Tanking Membranes) | Pest Control | Helifix | K-grip
Car Park Refurbishment