Print this page

Royal Shrewsbury Hospital

Project : Blackpool Pleasure Beach Checkerboard Waterproof Membrane

Project : Salford Old Fire Station

Project : Tithebarn, Liverpool

Project : Royal Shrewsbury Hospital 

PROJECT: Royal Shrewsbury Hospital

CLIENT: Shrewsbury and Telford Hospital

CONTRACT OVERVIEW: Damp and watreproofing, concrete repair



 SCOPE OF WORKS:

  • Carry out survey and mark up defective areas in the underground service duct.

  • Cut out defective concrete using suitable plant.

  • Remove all dust and debris and remove to skip/rubbish bags for removal.

  • Inspect state of steel reinforcement and position new if necessary. Prime existing steel work with steel reinforcement primer applied in accordance with manufacturer’s instructions.

  • Wet-on-wet apply concrete repair mortar in accordance with manufacturer’s instructions to restore concrete substrate to its original profile. Care should be taken to fill all voids ensuring full encapsulation around the exposed reinforcement.

  • Each repair to be finished with a wooden float.

  • Apply fairing coat if required in accordance with manufacturer’s instructions.

  • Attend site and using Sika 4a plug any points of water ingress, mechanically prepare concrete to receive 200mm wide sikadur combiflex Hypolon Strip.

STATUS: Principal contractor
VALUE: £40k
DURATION: 12 weeks


Previous page: Contact Us




Masonry Repair   |   Brickwork Repair   |   Stone Restoration   |   Marble and Terrazzo Restoration
Reconstituted Stone   |   Terracotta and Faience Restoration   |   Timber Repair   |   Epoxy Resin Injection
Concrete Repair   |   Structural Repair   |   Waterproof Deck Membranes   |   Damp Proofing
Basement Waterproofing (Tanking Membranes)   |   Pest Control   |   Helifix   |   K-grip
Car Park Refurbishment