
The British Museum
Project : Conway Borough Council A55
Project : Merseyway Bridge, Stockport
Project : Sale Leisure Centre, Swimming Pool
Project : London Business School
Project : Hollins Building
Project : The British Museum
Project : 201 Deansgate, Manchester
Project : Ellison Terrace & College House
Project : Kendals Store, Manchester
Project : The Foreign & Commonwealth Office
PROJECT: The British Museum, London WC1
CLIENT: The Trustees of the British Museum
DESIGNER: Frank Timothy Associates
ENGINEERS: John Mason & Partners
CONTRACT OVERVIEW: The stabilisation of the North Pediment

SCOPE OF WORKS:
Diamond core drilling down to 2.5m deep
Design and placing of epoxy resin grout
Supply and installation of stainless steel bars, plates and tie bars
Load testing of all anchorages
STATUS: Sub contractor to HBG Construction
VALUE: £34k
DURATION: 4 weeks
Previous page: Contact Us
Reconstituted Stone | Terracotta and Faience Restoration | Timber Repair | Epoxy Resin Injection
Concrete Repair | Structural Repair | Waterproof Deck Membranes | Damp Proofing
Basement Waterproofing (Tanking Membranes) | Pest Control | Helifix | K-grip
Car Park Refurbishment




